road 5

alvekonsult text UK 

CSB-9001-2008-color logo bg opti

 

       

Designer’s supervision of "STRUMA" highway, LOT 1 DOLNA DIKANYA-DUPNITSA from km 305 +220 to km 322 +000

Development of engineering design of Viaduct at km 320 +650 of "Struma" highway LOT 1

Preparation of complete engineering design at the phase of the tender for the project: "Modernization of the existing road alignment I-8 Kalotina-SOP from km 1 +000 to km 32 +447"

ROAD II-62 "Kyustendil-Dupnitsa-Samokov" OVERPASS over road I-1 and over the Dzherman river at km 36 +950

Engineering designs of the following projects:

  -  Reconstruction and rehabilitation of road НКV2142/III-5509, Svilengrad-Raykova Mogila / - Dimitrovche

  -  Reconstruction and rehabilitation of road НКV2147/I-8, Svilengrad – Kapitan Andreevo/ - Generalovo

  -  Reconstruction and rehabilitation of road НКV2148/I-8, Svilengrad – Kapitan Andreevo/ - Chernodab

  -  Reconstruction and rehabilitation of road НКV1149/III-505, MalkoGradishte- Svilengrad /SivaReka-Mezek- Svilengrad, NovoSeloArea, НКV3143/III-5509, Shtit -Sladun/-Mihalich

  -  Reconstruction and rehabilitation of road НКV1082/III-809,Lyubimets-Yerusalimovo/-GeorgiDobrevo-GranitsaMunicipality(Lyumibets- Svilengrad) -Momkovo- Svilengrad /II-55/

 -  Reconstruction and rehabilitation of road НКV1144/III-5509, Svilengrad -Shtit/Raykova Mogila-Mustrak-/III-5507/

Preparation of preliminary designs of:

  -  "Reconstruction of a road to the Village of Momkovo",      

  -  "Restoration of a bridge, Village of Momkovo",  

  -  "Reconstruction of the road network in Gebran Area, Town of Svilengrad”

Development of designs for rehabilitation and reconstruction of roads of the National Road Network with a length of 80 km

Development of designs for rehabilitation and reconstruction of roads in the Municipal Road Network with a length of 120 km